active: false
tags:
- project
- eg
created: 2024-11-01
---
## Goal
Rewire Poulsbo location with:
- Lighting zones
- Wall and ceiling outlets
- One breaker for each room
- Conduit for future kitchen
- Control boxes for all rooms
Set up escape room network hardware & software.
- 8 ethernet cables for cameras (8W each = 64W)
- 3 for WiFi AP's (21W each = 63W)
- 5 ethernet cables for room controllers
- 5 ethernet cables for GM stations
- 1 ethernet for cable modem
## To Do
- [x] Take USB switcher, HDMI cable, keyboard and mouse to the EG and hook up laptop 2025-04-06 ✅ 2025-04-06
- [x] Install and configure new modem 2024-07-13 ✅ 2025-04-25
- [x] Put track down wall for network and coax cable 2024-12-09 ✅ 2025-03-21
- [x] Wire up AP's 2024-07-13 ✅ 2025-03-27
- [x] Install WiFi AP's 2024-07-13 ✅ 2025-03-27
- [x] Install and configure UniFi Gateway 2024-07-13 ✅ 2025-03-27
- [x] Install the UPS 2025-03-02 ✅ 2025-03-27
- [x] Run ethernet cable for cameras 2025-03-02 ✅ 2025-03-16
- [x] Run ethernet cable to each of the control boxes 2025-03-02 ✅ 2025-03-16
- [x] Run ethernet cable to each of the WiFi AP's 2025-03-02 ✅ 2025-03-16
- [x] Cut out pieces for remaining 4 boxes 2025-03-02 ✅ 2025-03-04
- [x] Pre-drill screw holes for screws in 4 boxes 2025-03-02 ✅ 2025-03-04
- [x] Build server rack 2024-09-23 ✅ 2025-03-16
- [x] Drill green light to remaining 4 boxes 2025-03-02 ✅ 2025-03-16
- [x] Cut conduit, vent and fan holes in remaining 4 boxes 2025-03-02 ✅ 2025-03-16
- [x] Attach plugs and 3/8" flex conduit to 4 boxes 2025-03-02 ✅ 2025-03-16
- [x] Attach vents to 4 boxes 2025-03-02 ✅ 2025-03-16
- [x] Attach fans to 4 boxes 2025-03-02 ✅ 2025-03-16
- [x] Remove wall for in room #1 2025-03-02 ✅ 2025-03-16
- [x] Install box #1 2025-03-02 ✅ 2025-03-16
- [x] Install box #1 plug & switch boxes 2025-03-02 ✅ 2025-03-16
- [x] Wire box #1 2025-03-02 ✅ 2025-03-16
- [x] Replace wall in room #1 2025-03-02 ✅ 2025-03-16
- [x] Install box #3 2025-03-02 ✅ 2025-03-16
- [x] Install box #3 plug & switch boxes 2025-03-02 ✅ 2025-03-16
- [x] Wire box #3 2025-03-02 ✅ 2025-03-16
- [x] Install box #4 2025-03-02 ✅ 2025-03-16
- [x] Install box #4 plug & switch boxes 2025-03-02 ✅ 2025-03-16
- [x] Wire box #4 2025-03-02 ✅ 2025-03-16
- [x] Remove wall in room #5 2025-03-02 ✅ 2025-03-16
- [x] Install box #5 2025-03-02 ✅ 2025-03-16
- [x] Install box #5 plug & switch boxes 2025-03-02 ✅ 2025-03-16
- [x] Wire box #5 2025-03-02 ✅ 2025-03-16
- [x] Replace wall in room #5 2025-03-02 ✅ 2025-03-16
- [x] Install wire racks in ceiling of Odin's Dilemma 2025-02-11 ✅ 2025-03-02
- [x] Configure RingCentral 2025-02-13 ✅ 2025-02-13
- [x] Order cable modem ⏫ 2024-11-03 ✅ 2024-12-01
- [x] Order WiFi AP's ⏫ 2024-07-13 ✅ 2024-12-01
- [x] Order router micro PC machine ⏫ 2024-07-13 ✅ 2024-12-01
- [x] Order a battery backup device ⏫ 2024-07-13 ✅ 2024-12-01
- [x] Order a network hub 2024-12-01 ✅ 2025-02-11
- [x] Install plug in control box 2025-02-23 ✅ 2025-03-02
- [x] Install green light in control box 2025-02-28 ✅ 2025-03-02
- [x] Install power switch 2025-02-28 ✅ 2025-03-02
- [x] Install light switch 2025-02-28 ✅ 2025-03-02
- [x] Attach control box to the wall 2025-02-23 ✅ 2025-03-02
- [x] Mark exit signs with broken lights 2025-02-11 ✅ 2025-02-16
- [x] Put all exit signs back up 2025-02-11 ✅ 2025-02-16
- [x] Install switch to both ends of the control room 2025-01-14 ✅ 2025-01-31
- [x] Install switch at the end of room 5 for meeting room lights 2025-01-14 ✅ 2025-01-31
- [x] Install plug on room 5 outer wall ✅ 2025-01-31
- [x] Install room 1 exit signs 2024-12-11 ✅ 2025-01-31
- [x] Install room 2 exit signs 2024-12-11 ✅ 2025-02-11
- [x] Install room 3 exit signs 2024-12-11 ✅ 2025-02-11
- [x] Install room 4 exit signs 2024-12-11 ✅ 2025-02-11
- [x] Install room 5 exit signs 2024-12-11 ✅ 2025-02-11
- [x] Install front door exit sign 2025-01-14 ✅ 2025-01-31
- [x] Install back door exit sign 2025-01-14 ✅ 2025-01-31
- [x] Install back hallway exit sign 2025-01-14 ✅ 2025-01-31
- [x] Install middle hallway exit sign 2025-01-14 ✅ 2025-01-31
- [x] Install front hallway exit sign 2025-01-14 ✅ 2025-01-31
- [x] Install control room front exit sign 2025-01-14 ✅ 2025-01-31
- [x] Install control room back exit sign 2025-01-14 ✅ 2025-01-31
- [x] Electrical inspection 2025-01-17 ✅ 2025-01-31
- [x] Install kitchen conduit 2024-12-11 ✅ 2025-01-14
- [x] Install room 1 conduit 2024-12-11 ✅ 2025-01-14
- [x] Install room 1 wiring 2024-12-11 ✅ 2025-01-14
- [x] Install room 1 lights 2024-12-11 ✅ 2025-01-14
- [x] Install room 2 conduit 2024-12-11 ✅ 2025-01-14
- [x] Install room 2 wiring 2024-12-11 ✅ 2025-01-14
- [x] Install room 2 lights 2024-12-11 ✅ 2025-01-14
- [x] Install room 3 conduit 2024-12-11 ✅ 2025-01-14
- [x] Install room 3 wiring 2024-12-11 ✅ 2025-01-14
- [x] Install room 3 lights 2024-12-11 ✅ 2025-01-14
- [x] Install room 4 conduit 2024-12-11 ✅ 2025-01-14
- [x] Install room 4 wiring 2024-12-11 ✅ 2025-01-14
- [x] Install room 4 lights 2024-12-11 ✅ 2025-01-14
- [x] Install room 5 conduit 2024-12-11 ✅ 2025-01-14
- [x] Install room 5 wiring 2024-12-11 ✅ 2025-01-14
- [x] Install room 5 lights 2024-12-11 ✅ 2025-01-14
- [x] Bend the back light conduit to go over back lights/power conduit 2024-12-16 ✅ 2024-12-29
- [x] Install back hall/power wiring 2024-12-11 ✅ 2024-12-29
- [x] Install back hall lights 2024-12-20 ✅ 2024-12-29
- [x] Install toilet conduit 2024-12-20 ✅ 2024-12-29
- [x] Install toilet light/switch/fan/plug 2024-12-20 ✅ 2024-12-29
- [x] Install utility room conduit 2024-12-20 ✅ 2024-12-29
- [x] Install utility light/switch 2024-12-20 ✅ 2024-12-29
- [x] Install meeting conduit 2024-12-11 ✅ 2024-12-29
- [x] Install meeting wiring 2024-12-11 ✅ 2024-12-29
- [x] Install meeting lights 2024-12-20 ✅ 2024-12-29
- [x] Install escape room conduit to breaker 2024-12-11 ✅ 2024-12-29
- [x] Install kitchen conduit to breaker 2024-12-11 ✅ 2024-12-29
- [x] Install kitchen conduit 2024-12-11 ✅ 2024-12-29
- [x] Install control room lights ✅ 2024-12-14
- [x] Install front/front hallway/middle hallway lights 2024-12-11 ✅ 2024-12-14
- [x] Install back conduit to breaker 2024-12-11 ✅ 2024-12-14
- [x] Add back lighting/meeting area lighting circuit artboard 2024-12-09 ✅ 2024-12-20
- [x] Add back power circuit artboard 2024-12-09 ✅ 2024-12-20
- [x] Add meeting area power artboard 2024-12-09 ✅ 2024-12-20
- [x] Buy more collars, black/white 12 AWG wire, pack of screw drivers, deWalt driver bits 2024-12-14 ✅ 2024-12-20
- [x] Return 4" boxes and covers to Silverdale 2024-11-23 ✅ 2024-12-20
- [x] Install back hall lighting/power conduit 2024-12-11 ✅ 2024-12-20
- [x] Move the heating circuit up and above the rafters 2024-11-26 ✅ 2024-12-09
- [x] Get a big printout of the wiring diagram 2024-11-26 ✅ 2024-12-09
- [x] Move the outside light circuit up above the rafters 2024-11-26 ✅ 2024-12-09
- [x] Remove the conduit around the lighting circuits 2024-11-26 ✅ 2024-12-09
- [x] More 4" boxes with earth connectors 2024-12-02 ✅ 2024-12-09
- [x] Flat nailing plates 2024-11-23 ✅ 2024-12-02
- [x] Get a large printout of the electrical plan 2024-11-22 📅 2024-11-25 ✅ 2024-12-02
- [x] 22 4" boxes with earth nub 2024-11-23 ✅ 2024-12-02
- [x] Tool belt for Carmen 2024-11-23 ✅ 2024-12-02
- [x] Count how many big light fixtures are in the space now 2024-11-01 ✅ 2024-11-02
- [x] How far apart or the roof joists and how many? 2024-11-01 ✅ 2024-11-02
- [x] What is power draw of the light fixtures? 2024-11-01 ✅ 2024-11-02
- [x] How many big lights on each circuit right now? 2024-11-01 ✅ 2024-11-02
- [x] What is the power draw of the small can light fixtures? 2024-11-01 ✅ 2024-11-02
- [x] Order cameras 🔺 2024-09-23 ✅ 2024-10-30
- [x] Watch videos on how to bend EMT conduit 🔺 2024-11-06 ✅ 2024-11-22
- [x] Apply for the L&I permit for the space and display 🔺 2024-11-06 ✅ 2024-11-22
- [x] Remove the light switch circuit from beside he breaker box. ✅ 2024-11-22
- [x] Open breaker box and remove all the stuff on the left side of the box ✅ 2024-11-23
- [x] Add water heater to drawing 2024-11-01 ✅ 2024-11-22
- [x] Add all control room outlets to the drawing 2024-11-01 ✅ 2024-11-22
- [x] Add all lighting conduit and junction box runs to the drawing 2024-11-01 ✅ 2024-11-22
- [x] Add circuits for each puzzle room to the drawing 2024-11-01 ✅ 2024-11-22
- [x] Add meeting area, reception and back hall outlets to the drawing 2024-11-01 ✅ 2024-11-22
- [x] Add location of cameras to the drawing 2024-11-01 ✅ 2024-11-22
- [-] Add location of existing conduit runs to the drawing 2024-11-01 ❌ 2024-11-22
- [x] Add location of the exit signs to the drawing 2024-11-01 ✅ 2024-11-22
- [x] Order concrete screws 2024-11-03 ✅ 2024-11-22
## Notes
Always power to switch first.
Every switch & plug must have a neutral wire in the box.
OK to use conduit as ground.
Lights and plugs on separate circuits
Every power line from a breaker must have a matching neutral line.
Exit signs must be fed by the lighting circuits, ahead of any switching.
30 joists, 32" on center.
Power draw of lights is between 50W and 65W each.
There are 54 big light fixtures and 8 small light fixtures. There are currently 46 big light fixtures currently. Kitchen will require at least 6 circuits all 20A with 12/2 NM and GFCI/AFCI:
- Fridge
- Dishwasher
- Garbage Disposal
- Microwave Oven
- Small Appliance #1
- Small Appliance #2
A cook top requires:
- 220V/50A 6/3 NM cable
Separate circuit for the alarm and camera system.
16 exit sign lights.
![[Breaker Labels.pdf]]
## References
- [Multiwire Branch Circuit - Electrical 101](https://www.electrical101.com/multiwire-branch-circuit.html)
- [National Electrical Code - Multiwire Branch Circuit - Transworld Electric](https://twielectric.com/national-electrical-code-multiwire-branch-circuit)
- https://learnmetrics.com/how-many-outlets-on-a-15-amp-20-amp-30-amp-circuit-nec/
- https://www.indeed.com/career-advice/finding-a-job/religious-degree-jobs
- https://www.amazon.com/Sunco-Selectable-Temperature-Dimmable-Dustproof/dp/B0BWLH379Z
- [How Many Outlets On A 15 Amp, 20 Amp, 30 Amp Circuit? (NEC 210.21)](https://learnmetrics.com/how-many-outlets-on-a-15-amp-20-amp-30-amp-circuit-nec)
- [Electrical Circuit Requirements for Kitchens](https://www.thespruce.com/kitchen-wiring-circuits-1152911)
- https://www.bradyid.com/resources/wiring-color-codes
- https://lni.wa.gov/licensing-permits/electrical/electrical-permits-fees-and-inspections/purchase-permits-request-inspections
- https://www.lni.wa.gov/forms-publications/F500-109-000.pdf
- https://www.wikihow.com/Install-Electrical-Conduits
- https://www.nema.org/docs/default-source/technical-document-library/steel-conduit-and-emt-proven-to-meet-the-nec-reg.pdf
- https://diy.stackexchange.com/questions/74977/is-an-explicit-ground-wire-required-through-steel-conduit
- https://www.homedepot.com/p/Southwire-500-ft-14-Gauge-White-Solid-CU-THHN-Wire-11580858/203401597
### NFPA 70 NEC 2023 Extracts
#### Connectors
250.8 Connection of Grounding and Bonding Equipment.
(A) Permitted Methods. Equipment grounding conductors,
grounding electrode conductors, and bonding jumpers shall be
connected by one or more of the following means:
(1) Listed pressure connectors
(2) Terminal bars
(3) Pressure connectors listed ao; grounding and bonding
equipment
(4) Exothermic welding processes;
(5) Machine screw-type fasteners that engage not Jcs. o; than
two thrcado; or arc secured "ith a nut
(6) Thread-forming machine screws dtal engage not lcs. o; than
two threads; in dlc enclosure
(7) Connections that arc part of a listed a"l.o;cmbly
(8) Othcr listed means
(B) Methods Not Permitted. Connection devices or fittings
that depend solely on solder shall not be used.
### Control Boxes
- https://www.amazon.com/Nilight-90014E-Rocker-Toggle-Warranty/dp/B07QKFD7Z7
- https://www.amazon.com/DaierTek-125VAC-Waterproof-Automotive-Aircraft/dp/B07T6YNRZS
### WiFi
- Escape Gallery WiFi password - `Berserker!`
- [Packet Sender - Free utility to for sending / receiving of network packets. TCP, UDP, SSL.](https://packetsender.com/)
- [ARRIS Surfboard S33 DOCSIS 3.1 Multi-Gigabit Cable Modem](https://www.amazon.com/gp/product/B08FMSC5WZ)
- [Manage your APC battery backup system with this Linux command](https://opensource.com/article/21/12/linux-apcupsd)